We make the home extension process seamless and transparent from start to finish.
Tell us about your home extension vision through our quick estimate form.
Receive a detailed estimate based on our construction expertise.
Move forward with a clear roadmap and dedicated team.

About Builders Waikato
Ben started Builders Waikato because South Waikato homeowners were being let down: quoted low, hit with undisclosed variations, and left to deal with non-compliant structural work. We built this company on a different model: one Licensed Building Practitioner, one phone number, the same person on-site from the first conversation to the final Code Compliance Certificate.

Our Guarantee
All Restricted Building Work is completed under Ben's LBP licence to NZS 3604.
Exactly 12 months after handover, Ben personally returns to inspect and fix any settlement adjustments.
If unexpected work arises, we stop, document it, and present a written variation. Nothing proceeds without your approval.
Client Feedback
"We have used plenty of builders over the years and the difference with Builders Waikato is the follow-through. Issues get sorted, calls get returned. The extension looks amazing and we have had a dozen compliments from neighbours."
The Process
A structured approach to ensure your extension is delivered on time, on budget, and to the highest standard.
Initial discussion to understand your space requirements, timeline, and budget range.
Ben visits your site to assess existing structure, ground conditions, and boundary setbacks.
Based on ground conditions, we determine the appropriate foundation and provide a costed explanation.
Fully itemised written estimate covering excavation, foundation, framing, roofline, and interior fit-out.
We coordinate with local designers for construction drawings and submit the consent package to SWDC.
Boundary pegging, site protection, and excavation to the engineered depths.
Concrete slab pour or pile installation. Framing to NZS 3604 and roofline tie-in.
Licensed plumbing and electrical, linings, final inspection, CCC application, and 12-month walkthrough scheduled.