QUESTION 1 OF 13

    How many bathrooms are being renovated?

    Tap an option to continue — use Back to change an earlier answer.
    Builders Waikato

    Contact number:

    +64 27 223 2483

    Email address:

    bdbuiltnz@gmail.com
    Google

    4.9 STAR

    CUSTOMER RATING

    The Blueprint

    How It Works

    We make the bathroom renovation process seamless and transparent from start to finish.

    Step 1: Submit project details

    Tell us about your bathroom renovation vision through our quick estimate form.

    Step 2: Review estimate

    Receive a detailed estimate based on our construction expertise.

    Step 3: Start your build

    Move forward with a clear roadmap and dedicated team.

    Builders Waikato Team

    About Builders Waikato

    South Waikato's Trusted Renovation Builder

    Ben started Builders Waikato because South Waikato homeowners were being let down: quoted low, hit with undisclosed variations, and left to deal with non-compliant structural work. We built this company on a different model: one Licensed Building Practitioner, one phone number, the same person on-site from the first conversation to the final Code Compliance Certificate.

    • Licensed Building Practitioner (LBP)
    • Written Estimates with Itemised Line Items
    • South Waikato Locals
    100% Guarantee Seal

    Our Guarantee

    Three Explicit Promises. No Fine Print.

    AS/NZS 3740 Waterproofing Warranty

    All wet-area waterproofing is applied to standard. The membrane is inspected before any tiling proceeds.

    The 12-Month Post-Completion Walkthrough

    Exactly 12 months after handover, Ben personally returns to inspect and fix any settlement adjustments.

    No Unapproved Variations

    If unexpected work arises, we stop, document it, and present a written variation. Nothing proceeds without your approval.

    Client Feedback

    What Our Clients Say

    "We had a specific brief for our bathroom and Ben took it seriously. He flagged a waterproofing issue with the existing substrate that we had no idea about. Fixing it early saved us a lot of money. The finished result is excellent."

    Dave and Maria C.
    Tokoroa — Bathroom Renovation

    The Process

    Our Roadmap

    A structured approach to ensure your renovation is delivered on time, on budget, and to the highest standard.

    01

    Scoping Consultation

    We review the existing layout, discuss the scope of works, and confirm your fixture and finish selections.

    02

    Strip-Out and Assessment

    Careful removal of existing fittings, tiles, linings, and cabinetry to diagnose any underlying issues.

    03

    Subfloor and Framing Assessment

    We inspect the exposed structure for rot, mould, moisture damage, and levelling requirements.

    04

    Framing Repairs & Prep

    Damaged framing is replaced. The substrate is prepared to the flatness and cleanliness requirements.

    05

    AS/NZS 3740 Waterproofing

    Surfaces are waterproofed using compliant membranes and inspected before any tiling proceeds.

    06

    Tiling and Cabinetry

    Wall and floor tiling in the confirmed layout. Cabinetry installation and bench or vanity fit-out.

    07

    Licensed Trade Fit-Out

    Licensed plumbers and electricians install all connections, lighting, and additional circuits.

    08

    Final Inspection and Handover

    Final quality check, warranty documentation provided, and your 12-month walkthrough scheduled.

    Questions

    FAQ for Bathroom Renovations

    Avatar
    Hi there! Have a question? Chat with us here.